livebox:hah_hahnode:airwick

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revisionBoth sides next revision
livebox:hah_hahnode:airwick [2012/05/22 12:11] – [Assembly instructions for the Airwick] minerva9livebox:hah_hahnode:airwick [2012/05/23 12:55] – [Assembly instructions for the Airwick] minerva9
Line 37: Line 37:
 || There are three wires that need to be soldered onto the Airwick PCB. These connect power/ground and the PIR signal to the HAHnode board. In addition, there is a link wire that needs to be fitted to the Airwick PCB. Ideally, use difference colours of wire to avoid confusion.  The 'link' wire.  This wire bridges the Gnd signal between a couple of points on the PCB. || {{6929392059_61f1d49e22_b.jpg?320}} || || There are three wires that need to be soldered onto the Airwick PCB. These connect power/ground and the PIR signal to the HAHnode board. In addition, there is a link wire that needs to be fitted to the Airwick PCB. Ideally, use difference colours of wire to avoid confusion.  The 'link' wire.  This wire bridges the Gnd signal between a couple of points on the PCB. || {{6929392059_61f1d49e22_b.jpg?320}} ||
 || We cut away the plastic part that used to hold the canister. This allows better access to the HAHnode PCB.\\ Initially I left too much tube, the arrow shows where to cut, I used a hacksaw, just above the tongues. || {{6783272238_1202d4a576_b.jpg?320}} || || We cut away the plastic part that used to hold the canister. This allows better access to the HAHnode PCB.\\ Initially I left too much tube, the arrow shows where to cut, I used a hacksaw, just above the tongues. || {{6783272238_1202d4a576_b.jpg?320}} ||
-|| Wire up the LDR sensor. Don't forget to fit the little white grommet - this makes for a nicer finish when the LDR is mounted in the Airwick case. || {{http://farm8.staticflickr.com/7207/6929391345_74c70701d7_b.jpg?320}} ||+|| Wire up the LDR sensor. Obviously, polarity of the connection is unimportant. Don't forget to fit the little white grommet - this makes for a nicer finish when the LDR is mounted in the Airwick case. || {{http://farm8.staticflickr.com/7207/6929391345_74c70701d7_b.jpg?320}} ||
 || Wire up the DS18B20 Temp sensor. The insulation tube that is supplied is heatshrink. A quick blast from your heatshrink gun (or a paint stripper gun) will do the job.  || {{6783273502_f2bfcdaa68_b.jpg?320}}\\ {{6929391679_a1571009a9_b.jpg?320}} || || Wire up the DS18B20 Temp sensor. The insulation tube that is supplied is heatshrink. A quick blast from your heatshrink gun (or a paint stripper gun) will do the job.  || {{6783273502_f2bfcdaa68_b.jpg?320}}\\ {{6929391679_a1571009a9_b.jpg?320}} ||
 || Attach sensors || {{6929391161_584aa1d219_b.jpg?320}} || || Attach sensors || {{6929391161_584aa1d219_b.jpg?320}} ||
  • livebox/hah_hahnode/airwick.txt
  • Last modified: 2014/02/22 16:53
  • by minerva9